Close Menu
Fund Focus News
    Facebook X (Twitter) Instagram
    Trending
    • What are AT1 bonds? Features, risks, and how they differ from regular bonds
    • Want to start SIP for mutual fund? Here’s a step-by-step guide for how to make the most of your investment
    • Comparing Bond ETFs: Vanguard’s BSV vs. iShares’ IGSB
    • Ignore Hormuz – 3 Energy ETFs That Can Rally No Matter What Happens
    • Spot, ETFs, or Futures: High-Potential Crypto Investment Option
    • ICICI Prudential Mutual Fund declares IDCW payout: What does the option mean? Check date, payout, eligibility & more
    • How to earn a tax-free second income from UK property without purchasing a buy-to-let
    • Best Mutual Funds to Invest in April 2026: Top 10 Expert Picks
    Facebook X (Twitter) Instagram
    Fund Focus News
    • Home
    • Bonds
    • ETFs
    • Funds
    • Investments
    • Mutual Funds
    • Property Investments
    • SIP
    Fund Focus News
    Home»Funds»Rail projects in Alaska, South Dakota, Wyoming receive federal funds
    Funds

    Rail projects in Alaska, South Dakota, Wyoming receive federal funds

    October 16, 2024


    Logo for Federal Railroad AdministrationWASHINGTON — Nine projects in Alaska, South Dakota, and Wyoming have received more than $108 million in federal funding under a program for states that do not have Amtrak passenger service or are not connected to the national rail network.

    Six of the projects are in South Dakota, two are in Alaska and one is in Wyoming. They are funded under the Federal Railroad Administration’s Special Transportation Circumstances Grant Program.

    “No matter where you live in this country, rail systems play a critical role in getting people and goods where they need to go, and the STC grants ensure that no state is left behind when it comes to the development of a robust freight rail transportation system,” FRA Administrator Amit Bose said in a press release. “From funding upgrades to rail infrastructure resiliency and capacity to improving safety features at highway-rail grade crossings, these grants will strengthen American businesses and supply chains while making rail operations even safer.”

    Except as noted, railroads or local governmental agencies must provide a 20% non-federal match to the FRA funding.\

    Projects selected are:

    In Alaska, for the Alaska Railroad:

    — Up to $11.6 million for terminal track rehabilitation in Seward and Fairbanks. At both locations, 70-pound rail will be replaced with heavier rail, wood ties will be replaced with steel ties, and the tracks involved will be ballasted and resurfaced; in Fairbanks, new turnouts will also be installed.

    — Up to $4 million for the acquisition of approximately 20 new flat cars to be used for both intermodal and manifest freight service.

    In South Dakota:

    — For the Dakota Minnesota Valley & Western Railroad, up to $17.6 million for rehabilitation of the Britton Line. The work will include 9.2 miles of installing 115-pound jointed rail; installation of approximately 27,250 ties, 58,800 tons of ballast, skew tie correction, and surfacing; environmental review, design, and construction to replace four switches and install four new concrete crossings.

    — For the Rapid City, Pierre & Eastern Railroad, up to $14.06 million for the Upper Black Hills Corridor Upgrade Project. This will involve upgrading approximately 16.13 miles of rail, replacement or improvement of 34 structures, new turnouts, surfacing, ballast shoulder profiling, and grade-crossing improvements, allowing the project area to handle 286,000-pound standard railcars. The RCP&E will provide a 30% non-federal match.

    — For the D&I Railroad, up to $9.96 million for a main line rail relay project. The project involves replacing 12 miles of jointed rail with 115-pound welded rail, replacement of ties and ballast as needed, and improvements at 17 grade crossings.

    — For the Ringneck & Western Railroad, up to $8.3 million for grade crossing stabilization and repair. The project will include approximately 31,600 ties, 17,000 tons of ballast, 44.5 miles of surfacing, and replacement of culverts or bridge work at five locations.

    — For the Sisseton Milbank Railroad, up to $3.24 million for culvert rehabilitation, along with replacement of about 3,500 ties at the culvert locations.

    — For the Belle Fourche Industrial and Rail Park, up to $963,440 for a track inspection project. The project includes 2,695 feet of new track construction, 110 feet of track alignment, and installation of a new turnout. The track realignment will allow direct unloading from railcars to trucks on both sides of each track. Gravel laydown areas will also be constructed to facilitate loading, unloading, and temporary storage.

    In Wyoming:

    — For BNSF Railway and the Wyoming Department of Transportation, up to $38.7 million for a grade separation project at College Drive/State Route 212 in Cheyenne. The bridge will be built to meet BNSF clearance requirements and to allow for future track construction, and will eliminate a grade crossing that requires traffic to stop in a 50-mph zone.

    Additional details on the projects are available here.



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email

    Related Posts

    Child trust funds: a windfall at 18 – but what should you do next? | Child trust funds

    April 10, 2026

    Funds to buy in turbulent times

    April 10, 2026

    Debt funds see ₹2.94 lakh crore outflows in March amid year-end liquidity shift

    April 10, 2026
    Leave A Reply Cancel Reply

    Top Posts

    The Shifting Landscape of Art Investment and the Rise of Accessibility: The London Art Exchange

    September 11, 2023

    What are AT1 bonds? Features, risks, and how they differ from regular bonds

    April 12, 2026

    Charlie Cobham: The Art Broker Extraordinaire Maximizing Returns for High Net Worth Clients

    February 12, 2024

    The Unyielding Resilience of the Art Market: A Historical and Contemporary Perspective

    November 19, 2023
    Don't Miss
    Bonds

    What are AT1 bonds? Features, risks, and how they differ from regular bonds

    April 12, 2026

    After the financial crisis of 2008, all banks were mandated to protect the capital against…

    Want to start SIP for mutual fund? Here’s a step-by-step guide for how to make the most of your investment

    April 12, 2026

    Comparing Bond ETFs: Vanguard’s BSV vs. iShares’ IGSB

    April 12, 2026

    Ignore Hormuz – 3 Energy ETFs That Can Rally No Matter What Happens

    April 12, 2026
    Stay In Touch
    • Facebook
    • Twitter
    • Pinterest
    • Instagram
    • YouTube
    • Vimeo
    EDITOR'S PICK

    Motilal Oswal MF launches Infrastructure Fund

    April 23, 2025

    Experienced Investment Leadership Team Announces New Private Real Estate Investment Company, U.S. Property Development

    March 25, 2025

    SOL Price Remains Stable, While $200 Target Remains Intact Despite Solana ETFs’ Rejection

    August 21, 2024
    Our Picks

    What are AT1 bonds? Features, risks, and how they differ from regular bonds

    April 12, 2026

    Want to start SIP for mutual fund? Here’s a step-by-step guide for how to make the most of your investment

    April 12, 2026

    Comparing Bond ETFs: Vanguard’s BSV vs. iShares’ IGSB

    April 12, 2026
    Most Popular

    🔥Juve target Chukwuemeka, Inter raise funds, Elmas bid in play 🤑

    August 20, 2025

    💵 Libra responds after Flamengo takes legal action and ‘freezes’ funds

    September 26, 2025

    ₹10,000 monthly SIP in this mutual fund has grown to ₹1.52 crore in 22 years

    September 17, 2025
    © 2026 Fund Focus News
    • Get In Touch
    • Privacy Policy
    • Terms and Conditions

    Type above and press Enter to search. Press Esc to cancel.