Close Menu
Fund Focus News
    Facebook X (Twitter) Instagram
    Trending
    • Optimising Australia’s transmission grid with big, flexible batteries
    • New Singapore Exchange ETFs off to encouraging start, analysts say after first 30 days of trading
    • Abu Dhabi Islamic Bank prices $500m AT1 sukuk at 7%
    • Japan’s super-long bond auctions weaken as investors look to GPIF
    • Council considers £1.36m investment in Margate’s Tudor House
    • Adani Enterprises and Adani Power plan public bond sale to raise at least $220 million — TradingView News
    • Fidelity Wants a Chainlink ETF. Who Is Actually Buying One?
    • Is American Century Select Investor (TWCIX) a Strong Mutual Fund Pick Right Now?
    Facebook X (Twitter) Instagram
    Fund Focus News
    • Home
    • Bonds
    • ETFs
    • Funds
    • Investments
    • Mutual Funds
    • Property Investments
    • SIP
    Fund Focus News
    Home»SIP»Optimising Australia’s transmission grid with big, flexible batteries
    SIP

    Optimising Australia’s transmission grid with big, flexible batteries

    November 26, 2026


    Not many members of the general public realise that our power transmission lines routinely operate below 50 per cent capacity even when all assets are in service. They are designed to run this way to maintain uninterrupted power supply following the loss of a line, ensuring the remaining lines are not overloaded. Across Australia’s vast power transmission networks, that amounts to a lot of unused capacity. Meanwhile, the capacity of Australia’s fleet of batteries is growing, and at times of high renewable output these batteries are often charging or on standby.

    To maximise the utilisation of these lines, a new report from think-tank IEEFA and consultancy GEN2NEM proposes a portfolio of co-ordinated flexible battery energy storage systems (BESS) activated by a system integrity protection scheme (SIPS) as a means to increase power transfer on multiple transmission corridors. SIPS are already in use with the Waratah Super Battery in NSW and the Victorian Big Battery, allowing specific high-capacity transmission lines to carry more power by triggering rapid dispatch following an event, preventing system overloads. When the Victorian SIPS was developed, very few BESS were connected to the network, therefore the SIPS service was contracted from a single battery. In NSW, a SIPS was contracted with the state’s single largest battery, the Waratah Super Battery, after a competitive tender in 2023.

    Since that time, the number of battery connections have significantly increased, creating an opportunity for multiple batteries to participate in co-ordinated SIPS, rather than single batteries only. The benefit of drawing from a greater pool of batteries is that there is redundancy provided by multiple batteries, and the SIPS service could be provided more competitively and comprehensively across relevant transmission network areas.

    While dispatching energy from batteries to supply load can provide local firming capacity, a flexible BESS-SIPS portfolio could provide network benefits by enabling increased renewable energy zone export without depleting levels of stored energy.

    The growing fleet of batteries adds a significant asset to Australia’s energy mix, one that could be tapped to increase generator dispatch capacity and the efficiency of the power network. The proposed flexible BESS-SIPS portfolio can help bridge network capacity gaps as Australia transitions to a fleet of renewable generation, and increase the potential transfer capacity of new transmission developments.

    I suggest that energy market institutions and the energy industry collaborate to extend and optimise the provision of BESS–SIPS services to achieve higher levels of renewable generation dispatch and increased utilisation of network assets, contributing to downward pressure on wholesale energy prices.

    Another possible area for extension of existing BESS–SIPS services is enabling optimised quantities of battery reserve to respond to faults on multiple transmission corridors. Different subsets of BESS could optimise power flow on different transmission corridors and help manage the loss of large loads and generators.

    For instance, a scheme with a 600MW Flexible BESS–SIPS Portfolio has the potential to:

    • Optimise power transfer on multiple corridors, noting that the likelihood of a single event affecting export from multiple REZs is unlikely.
    • Maximise power transfer by allowing transfers above levels set by available resecuring reserve.
    • Maximise power transfer during planned outages by allowing transfers above levels set by maximum contingency risks.
    • Allow battery charging at times of high demand and high renewable export.

    The Australian Energy Market Commission (AEMC) should consider the benefits of a portfolio BESS delivering a flexible BESS–SIPS response to increase network utilisation as part of its Electricity Network Regulation Review.

    The BESS-SIPS reserves should be procured in a flexible, dynamic manner, such that they are available when required, rather than all the time. In the short term, flexible BESS-SIPS reserves could be procured through existing non-market routes, such as government tenders, a transmission network support agreement, a Network Support and Control Ancillary Services contract, or a Type 1 or Type 2 Transitional Services contract. In the longer term, a dedicated rule change request could explore the benefits of establishing a new mechanism.

    We recommend that a system trial is undertaken to capture the number and duration of periods when a Flexible BESS–SIPS Portfolio would be required, the available battery capacity and the potential uplift in capacity to quantify network benefits.
     

    First published in The Energy. 

    To read the report on which this article is based, click here. 



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email

    Related Posts

    How interest rate changes affect debt funds: Short- vs long-duration funds | Personal Finance

    November 26, 2026

    GL Communications Enhances MAPS SIP-I Emulator with Advanced ISUP Signaling Support

    November 26, 2026

    A new place for sips, snacks is joining SouthPark’s restaurant scene. What to know

    November 25, 2026
    Leave A Reply Cancel Reply

    Top Posts

    Tradr Launches 2X Long and Short Leveraged ETFs on Anthropic

    November 23, 2026

    Optimising Australia’s transmission grid with big, flexible batteries

    November 26, 2026

    New Singapore Exchange ETFs off to encouraging start, analysts say after first 30 days of trading

    November 26, 2026

    Japan’s super-long bond auctions weaken as investors look to GPIF

    November 26, 2026
    Don't Miss
    SIP

    Optimising Australia’s transmission grid with big, flexible batteries

    November 26, 2026

    Not many members of the general public realise that our power transmission lines routinely operate…

    New Singapore Exchange ETFs off to encouraging start, analysts say after first 30 days of trading

    November 26, 2026

    Abu Dhabi Islamic Bank prices $500m AT1 sukuk at 7%

    November 26, 2026

    Japan’s super-long bond auctions weaken as investors look to GPIF

    November 26, 2026
    Stay In Touch
    • Facebook
    • Twitter
    • Pinterest
    • Instagram
    • YouTube
    • Vimeo
    EDITOR'S PICK

    A $78 Billion Hedge Fund Dumps These 3 Stocks

    November 19, 2026

    FEPI: The New Cornerstone Of Income ETFs (NASDAQ:FEPI)

    August 18, 2024

    Budget 2026: Mutual fund industry seeks income tax stability, revival of debt scheme incentives

    January 28, 2026
    Our Picks

    Optimising Australia’s transmission grid with big, flexible batteries

    November 26, 2026

    New Singapore Exchange ETFs off to encouraging start, analysts say after first 30 days of trading

    November 26, 2026

    Abu Dhabi Islamic Bank prices $500m AT1 sukuk at 7%

    November 26, 2026
    Most Popular

    🔥Juve target Chukwuemeka, Inter raise funds, Elmas bid in play 🤑

    August 20, 2025

    💵 Libra responds after Flamengo takes legal action and ‘freezes’ funds

    September 26, 2025

    🇮🇸 CPP Investments and Equinix complete atNorth acquisition to support growth of leading Nordic data center platform

    September 1, 2026
    © 2026 Fund Focus News
    • Get In Touch
    • Privacy Policy
    • Terms and Conditions

    Type above and press Enter to search. Press Esc to cancel.